There’s still a thick layer of dust on absolutely every single surface, it’s going to take a lot of TLC to polish everything up for the camera, but as promised, here are some new photos of where the house is at right now.
Our en-suite is done! It’s a huge bathroom twice as big as it used to be. Mmmm heated towel rails. :)
We designed a built in shelf to hold shampoo and soap and like the guest bathroom it’s a walk in shower (no glass to clean!).
Lots of storage space, a huge compartment under the sink, compartments behind the mirrors and all of it is soft close, even the toilet, which is great as you can just shut the lid/doors without making loud banging noises.
We had an issue with the steps in the house, they were actually sticking out from the floor in the wardrobe room so we had to raise the tub, looks great though we think!
Every single powerpoint in the house has been replaced with these new slim/stainless steel ones.
The guest bathroom is finished as well.
New door handles replace the old gold ones. Amazing how much difference new handles make, they just feel so solid, smooth and new.
New large entrance tiles replace the ugly old pink ones.
We’re painting the driveway a dark grey to match the roof of the house which we’ve also painted (it was a bright orange/terracotta roof before).
The roof of the garage used to be a porous concrete of some sort which used to crumble onto my car, that’s now been fixed with a faux ceiling.
There’s still quite a bit of work to be done outside (new gates, garden landscaping) and we’ve still got to find some new room lights, carpet the bedroom and other bits and pieces but I estimate another 2-3 weeks before I can move back in again.